Charging masterpieces
You spend months on a façade. We make sure the last object on or in front of it belongs there too.
Conduits, routing, capacity: leave it until the drawings are fixed and you pay for it in demolition work, a surface-mounted conduit, or a grey box on the best façade of the project. Taking it along early costs you half an hour. Solving it late costs a compromise. We design and build premium EV chargers in-house, in Belgium. Winner of the Red Dot and iF Design Award, though what will matter more to you: the same care for material and detail you put into the rest of the building. Seamless finish, concealed fixings, cable routing out of sight.
To specify a Veton, six things need fixing early:
All six return in every project, and all six should be settled before the plan is final. The numbers differ per model: the Architect Kit below holds a checklist that points to the right line on each spec sheet, sheets also included.
Get the download right here on the page, no waiting.
Leave this field blank
I have a project in the design stage where this comes up
Input on a design or a custom cover, or a missing file. Or simply to get acquainted with our brand.